CertBus ensures to provide the most update 000-433 IBM Tivoli Storage Manager V5.5 Implementation exam questions with the most accurate answers. CertBus 000-433 are the most complete and authoritative exam preparation materials with which one can pass the 000-433 exam in an easy way. Preparing for IBM 000-433 IBM Tivoli Storage Manager V5.5 Implementation exam is really a tough task to accomplish. But CertBus will simplified the process.
We CertBus has our own expert team. They selected and published the latest 000-433 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-433.html
QUESTION NO:11
The data going into the target Sequential Files stage is range-partitioned and sorted. Which
technique method would be the most efficient to create a globally sorted target sequential file?
A. Select an in-stage sort in the final Sequential File stage.
B. Select the Ordered collector method for the final Sequential File stage.
C. Select the Sort Merge collector method for the final Sequential File stage.
D. Insert a Funnel stage before the final Sequential File stage and select Sequence as Funnel
Type.
Answer: B
Explanation:
QUESTION NO:49
An administrator has a new, local, IP-based printer that is not communicating with the system. Ping is successful using the printer IP address and the printer name, and response time is acceptable. Users can print from Windows.
What should the administrator do next to troubleshoot the printer?
A. Verify that there is a route configured to the printer.
B. Use the TRACEROUTE command to find where the connection fails.
C. Verify that the printer address is correcting the HOSTS table on the system.
D. Display the printer device description to confirm that the correct port has been configured.
Correct Answer: D
QUESTION NO: 45
A company has an extensive list of Miscellaneous XML Threats that they require protection from.
The list includes: ?XML Entity Expansion and Recursion Attacks ?XML Wellformedness-based
Parser Attacks ?Memory Space Breach and Buffer Overflow Attacks ?Public Key DoS Attacks
?Resource Hijack Attacks What must the solution implementer do to protect SOA Applications
exposed via a WSDL and a Web Service Proxy service?
A. Enable the web service proxy\’s QL Injection Protection?Enable the web service proxy\’s ?QL
Injection Protection?
B. Enable the web service proxy\’s ingle Message XML Denial of Service (XDoS)
Protection”.Enable the web service proxy\’s ?ingle Message XML Denial of Service (XDoS)
Protection”.
C. Enable the web service proxy\’s ultiple Message XML Denial of Service (MMXDoS)
Protection”.Enable the web service proxy\’s ?ultiple Message XML Denial of Service (MMXDoS)
Protection”.
D. Web service proxy default options protect against these threats. No configuration is required.
Answer: D
Explanation:
QUESTION NO:58
The solution implementer is testing a new service and finds that the client is receiving a soap fault
response during the test.
The default-log shows the following:
What conclusion can the solution implementer determine by analyzing and interpreting the above
log?
A. Parsing began on the message and failed due to mismatched XML tag.
B. Parsing of the URL began and too much memory was used when the request started.
C. The connection was terminated due to a client IP address parsing problem.
D. The connection did not reuse a persistent connection and triggered a parse error on the
response.
Answer: A
Explanation:
QUESTION NO:41
There is a requirement for a business process diagram to have two subsequent activities routed to
the same user. During a demonstration, a business user notices that upon completing the first task
they must return to their inbox to start the next task. The business user would prefer to have the
second task automatically appear upon completion of the first task and asks the BPM application
developer what options are available. How should the BPM application developer respond? This
can be configured by:
A. making a change to the 100Custom.xml file.
B. changing the first activity\’s routing to “Last User in Lane”.
C. changing the second activity\’s routing to “Last User in Lane”.
D. changing the implementation of the activity and selecting the “Automatically flow to next task”